Our Work

These days, no other company in the region can rival Faulks Investments for scope of work, equipment, quality and passion for the job.

From earthworks to demolition, haulage to construction, landscaping and section development, the team at Faulks are the team to ensure your project is completed on time and to the highest quality.

See some of our previous projects and current work below.

  • Construction site with a yellow excavator operating on dirt, with modern residential buildings and a partly cloudy sky in the background.

    5 Mile Villas

    WORKS INCLUDE: Bulk Earthworks, Cut To Fill, Cut To Waste, Import Certified Fill, Drainage, Water & Utilities, Kerbs, Roading & Footpaths
    LOCATION: Queenstown

  • A yellow excavator scooping dirt into a red dump truck at a construction site with mountains in the background.

    Te Pa Tahuna

    WORKS INCLUDE: Full Scale Civil Construction for 3 Multi-Story Units & Carpark, including 70m3 Stormwater Filtration System, Retaining Walls, Concrete Footpaths & an Asphalt Carpark.
    LOCATION: Queenstown

  • A construction site with tire tracks on dirt, grassy hills, and mountains in the background under a clear blue sky.

    The Paddock and Frogmore Lane

    PROJECT OUTLINE: Working with the owner to create two 5 & 6 lot rural subdivisions.
    WORKS INCLUDE: Bulk earthworks, Cut To Fill, Roading & Drainage
    LOCATION: Queenstown

  • Construction site of a large stadium with cranes and steel framework in an urban area with hills in the background.

    One.NZ Stadium

    WORKS INCLUDE: Bulk Excavation, Detailed Excavation For Foundation Beams
    MANAGING/RESPONSIBLE FOR: Environmental Site Protection, Dust Suppression, Sediment Tracking, Stormwater Protection From Sediment & Retention Pond Maintenance
    LOCATION: Christchurch

  • Under construction site with cranes, trucks, and building foundations in a cleared area.

    Pak'N'Save Rolleston

    WORKS INCLUDE: Removing Topsoil To Stockpile With Scrapers, Bulk Excavation, Cut To Subgrade For The Building, Built Up With AP40, Detailed Excavation For Foundation Beams, Sand Blinding, Carpark Cut To Subgrade, Trenching For Electrical Ducts, Preparing For Kerbs & Concrete
    LOCATION: Christchurch

  • An aerial view of a construction site surrounded by residential houses and sports fields, with construction equipment and materials visible.

    Lincoln High School

    WORKS INCLUDE: Remove Concrete Slab, Bulk Earthworks, Service Trenching. Full Siteworks Are Upcoming In 2025
    LOCATION: Christchurch

  • An aerial view of a construction site with a red fire truck and an excavator digging into the ground. Piles of debris and wood are in the background, surrounded by fences and nearby residential houses.

    36-38 Hallenstein Street

    WORKS INCLUDE: Remove Asbestos,  Demolish 2 Existing Houses, Level & Prepare the site and Building Pads for 8 Townhouses.
    LOCATION: Queenstown

  • A yellow Caterpillar excavator working on a construction site with dirt and soil, with a backdrop of trees and a clear blue sky.

    Kawarau Villas

    WORKS INCLUDE: Bulk Earthworks, Cut To Fill, Cut To Waste, Retaining Walls, Drainage, Carparks, Footpaths, Water & Utilities, Hard Landscaping
    LOCATION: Queenstown

  • A construction excavator working on a hilltop, with a scenic landscape of a lake, trees, and snow-capped mountains in the background.

    Peninsula Hill

    WORKS INCLUDE: Site Strip, Cut To Fill, Cut To Waste, Service Trenching, Backfill & Sand Blinding
    LOCATION: Queenstown

  • Three yellow compact excavators parked on a construction site with a modern building in the background and cloudy sky overhead.

    Ranui Apartments

    WORKS INCLUDE: Bulk Earthworks, Cut To Fill, Cut To Waste, Kerbs, Carparks & Commercial Crossings
    LOCATION: Christchurch

  • Road construction site with freshly paved walkway and orange traffic cones, workers in the background, and newly landscaped buildings in the distance.

    Belfast School

    WORKS INCLUDE: Demolition, Bulk Earthworks, Cut To Fill, Cut To Waste, Kerbs, Roading, Carparks & Footpaths
    LOCATION: Christchurch

  • Construction site with two excavators working on dirt, several workers present, and foundation markings for new building.

    Ferndale School

    WORKS INCLUDE: Bulk Earthworks. Still To Complete Siteworks This Year
    LOCATION: Christchurch